imtibuilds
P1 · Imtiaz

Chapter 4 of 5

Devlog

Untangling 500 settings: how I regrouped Dokan into 42 modules

What it is

About 500 interconnected settings, one new structure and UI. What I grouped, what I cut, and how we kept existing stores working.

The entry

In October 2026 we shipped a new settings structure for Dokan: about 500 interconnected settings, regrouped into 42 modules with a new interface. I did the categorization and the UI design.

Result

Every devlog entry shows the metric I set before building, the baseline, and what happened after. If it is too early to tell, the entry says so.

Next chapter

Where I test AI on my own products.